ثبت نام | ورود
English
امروز شنبه 1403.7.21 Iranian Construction Engineering and Management
صفحه اصلی
مقالات و آثار علمی

مقاله با عنوان پیش بینی زمان اتمام پروژه
Authors
Farshad Peiman, Mohammad Khalilzadeh, Nasser Shahsavari-Pour, Mehdi Ravanshadnia
Publication date
2023/12/26
Journal
Engineering, Construction and Architectural Management
Publisher
Emerald Publishing Limited
Description
Purpose
Earned value management (EVM)–based models for estimating project actual duration (AD) and cost at completion using various methods are continuously developed to improve the accuracy and actualization of predicted values. This study primarily aimed to examine natural gradient boosting (NGBoost-2020) with the classification and regression trees (CART) base model (base learner). To the best of the authors' knowledge, this concept has never been applied to EVM AD forecasting problem. Consequently, the authors compared this method to the single K-nearest neighbor (KNN) method, the ensemble method of extreme gradient boosting (XGBoost-2016) with the CART base model and the optimal equation of EVM, the earned schedule (ES) equation with the performance factor equal to 1 (ES1). The paper also sought to determine the extent to which the World Bank's two legal factors affect countries …


آرشيو مطالب...


Copyright 2012
تعداد کاربران: 42